Mirvac & Australian Technology Park

Aluminium Staircase at Australia Technology Park

Aluminium Staircase at Australia Technology ParkMirvac’s Commercial building at Australian Technology Park in Eveleigh, Sydney, is a 6-storey building with an approximate 9000 square metre floor plate. The building is a Structural steel frame categorised by a large atrium that splits the floor plates from East to West. It also has a large metal profile roof and glazed skylights that sit above the large atrium space.

RISSafety was engaged by Daniel Corry, Senior Project Engineer at Mirvac, to supply an aluminium handrail and walkway solution that led to the internal skylights. “One of the features of the building is its large atrium. At the roof of the Atrium we have a large structural steel skylight that is glazed this includes a walkway on either side of the glazed section, which runs all the way down the length of the Atrium, so about 500m in total. We needed the walkway to provide access for maintenance and to provide access to the BMU (Building Maintenance Unit) for cleaning and other purposes” Daniel said. RISSafety also designed, manufactured and installed aluminium ladder systems and platforms, lifeline systems, access stairs and ladder brackets to access areas within the Plantroom, and for Access to the retail awnings along the street frontages.

“I was looking for a cost-effective alternative to the standard options, which was specified on the project. We didn’t need a heavy-duty web forge requirement for the walkways. So, I put this out to tender, and I found RISSafety from an online Google search and gave them the opportunity to tender for it” Daniel said. “From the start, I found the RISSafety team quick to respond, they were informative and detailed in their responses, especially for the pricing submissions. I dealt with Jonathon mainly and he was very calming. We were under lots of pressure to find a workable solution, and Jonathon reassured me that RISSafety was perfectly suited to the task as this is what they do every day –it was an easy decision.”

While there were 3 suppliers who tendered for this project, RISSafety was the perfect choice. “RIS stood out for 2 main reasons: cost, and the type of material. The fact they could provide an aluminium option, it was the quickest and safest option (particularly from an installation perspective) and it meant that we did not need to use the heavy-duty web forge option. Because RIS fabricated the material in longer lengths, this meant the installation was completed in longer sections than what you would get in an alternative product. So, aluminium was the easiest product to use for installation – and even for the user’s point of view” Daniel went on to explain.

One of RISsafety’s key benefits is that they design, manufacture, install, test, certify and then re-certify all their safety systems themselves. So, they really are a one-stop-safety-shop. Daniel found this a real benefit and a point of difference, “I have used other suppliers in the past, not as big as this project. The others are predominantly a middle-man who fabricated the ladder or platform, then we would have to find a height safety company to certify the system – whereas RIS do that all in-house. We’ve had issues with other suppliers because they either do the design, or just get the material only – but then they need another sub-contractor to install on their behalf, and it just gets messy. With RIS, you just deal with one company.” This often saves you time and gives you peace of mind that one supplier can handle your entire project.

“I’m looking at another upcoming project, so I’ve already engaged RISSafety for a quote and further information. I’ll use RIS again because I now know they will give a good quality install that is backed by a large company, large enough that you know they won’t walk away from a job until it is finished” Daniel said. “Definitely one of the better subcontractors I’ve had on a job”.

Want to get the same peace of mind as Daniel, for your ongoing safety requirements? Get in touch with us today. We’d love to help you too.

 

Aluminium Stair Case with Power Coating Powder Coated Aluminium Stair Case Aluminium Wlakway Step Ladder with Platform Step Ladder Vertical Rung Ladder

More news

Project
September 16, 2026

Replacing a Non-Compliant Horizontal Lifeline System – Panorama Apartments, Perth

Project Overview When a horizontal lifeline system at Panorama Apartments in Perth CBD was found non-compliant, ESM Strata engaged RISSafety to decommission it and install a compliant replacement. Two existing wall-mounted lifelines had been identified as non-compliant, which meant contractors and abseil technicians had no certified system to work from… Read More

Project
September 9, 2026

Height Safety Inspection and Recertification at Scotch Oakburn College, Elphin Campus

Project Overview  RISSafety returned to Scotch Oakburn College’s Elphin Campus in Newstead, Tasmania, to complete the first scheduled 12-month height safety inspection of a rooftop system we previously designed and installed.  The inspection focused on reviewing the condition of all installed height safety components, confirming the system remains compliant and completing the recertification documentation… Read More

News
June 16, 2026

What Near Misses Can Reveal About Your Height Safety Culture

A worker connects a static line to an anchor point that hasn’t been inspected in over a year. A roofer steps around a guardrail rather than through the designated access point because it’s faster. A roof maintenance technician… Read More